Maz's new mill
Posted: Fri May 18, 2012 8:11 pm
hey guys, sorry I haven't been posting much lately as I have been very busy setting up the new workshop....
And here is the latest addition.....a stunning new mill complet with 3-axis DRO...... It took most of the day to get it off the pallet and assemble the stand so we could install the mill...the worst job was crawling inside the stand to tighten down the anchor bolts...a really awkward job and it wasn't going to be me.... As soon as the new tooling arrives we can get the mill commissioned and start chewing up some billet.....
Maz xx
And here is the latest addition.....a stunning new mill complet with 3-axis DRO...... It took most of the day to get it off the pallet and assemble the stand so we could install the mill...the worst job was crawling inside the stand to tighten down the anchor bolts...a really awkward job and it wasn't going to be me.... As soon as the new tooling arrives we can get the mill commissioned and start chewing up some billet.....
Maz xx